Awario Mentions Report
Showing
126–150
of
399
mentions
| ID | Date | Title | Source / Reach | Risk Tier / Reason | Summary (incl. Sentiment) | Link |
|---|---|---|---|---|---|---|
| #6 |
2026-09-06
00:27
|
Upper Trishuli-1 Hydropower Project ⚡ | 216 MW Nepal #hydropower #machine#nepal #disaster #flood
|
This is a routine operational/informational mention of the Upper Trishuli-1 project in a disaster-related context and does not establish corporate wrongdoing. Continued monitoring is warranted because flood-related content could develop into allegations concerning project safety or impacts.
|
A YouTube video provides a brief view of Nepal’s 216 MW Upper Trishuli-1 Hydropower Project along the Trishuli River and references hydropower sites in relation to a disaster or flood. No specific allegation or verified escalatory action is reported.
|
Open | |
| #333 |
2026-09-05
23:02
|
|
This is an unresolved humanitarian and operational recovery update naming the Upper Trishuli-1 project, with bodies still unrecovered, but it does not establish corporate wrongdoing or coordinated action. The continuing search could escalate into accountability concerns or family-led pressure if the crisis remains unresolved.
|
An Instagram post reports that search and recovery operations are continuing at the flood-hit Upper Trishuli-1 Hydroelectric Project in Rasuwa, with bodies not yet recovered.
|
Open | |
| #7 |
2026-09-05
16:21
|
Chinese National Rescued Alive After 10 Days in Nepal Tunnel 🇳🇵🇨🇳 #shorts #nepalnews #floods
|
This is a positive humanitarian and operational recovery update, and it does not establish corporate wrongdoing by UT-1 or its associated companies. The incident remains a sensitive project-related narrative that could attract further scrutiny if additional safety or accountability allegations emerge.
|
A Chinese national was reportedly rescued alive after 10 days inside a 225-metre tunnel at the Upper Trishuli-1 Hydropower Project in Rasuwa. The Nepal Army carried out the rescue with support from South Korean disaster-response personnel.
|
Open | |
| #367 |
2026-09-05
13:52
|
|
This is an operational rescue update reporting the safe extraction of a person from the Upper Trishuli-1 tunnel, with no allegation of corporate wrongdoing. The resolved incident is unlikely to escalate absent reports of further injuries, unsafe conditions, or accountability concerns.
|
An Instagram post reports that a person inside a tunnel at the Upper Trishuli-1 Hydropower Project was brought out by a joint team involving the Nepali Army and international rescuers.
|
Open | |
| #8 |
2026-09-05
13:21
|
Chinese national rescued alive after 11 days trapped in the Upper Trishuli-1 hydropower tunnel.🙏🚁
|
This is a positive operational and humanitarian recovery update reporting that a trapped worker was rescued alive; it establishes no corporate wrongdoing and may reduce concern associated with the incident.
|
A YouTube post reports that a Chinese national was rescued alive after spending 11 days trapped in the Upper Trishuli-1 hydropower tunnel.
|
Open | |
| #391 |
2026-09-05
13:08
|
|
This is an operational-impact mention reporting flood damage to the monitored Upper Trishuli-1 Hydropower Project and an anticipated official site visit; it does not establish corporate wrongdoing. Continued damage or perceived shortcomings in the response could escalate into accountability concerns or broader negative coverage.
|
An Instagram post reports that flooding damaged the Upper Trishuli-1 Hydropower Project and says an official is expected to visit the affected area. The post has limited reach and provides no allegation against the company.
|
Open | |
| #334 |
2026-09-05
12:05
|
|
This is a humanitarian and operational update involving workers from the Upper Trishuli-1 tunnel receiving hospital care; it does not establish corporate wrongdoing. If worker health concerns remain unresolved or generate further allegations about project safety, the narrative could escalate into accountability concerns.
|
An Instagram post reports that workers from the Upper Trishuli-1 Hydropower Project tunnel were taken to the Nepali Army Hospital in Chhauni, Kathmandu. The available snippet provides no further detail on their condition or the cause of the hospitalization.
|
Open | |
| #79 |
2026-09-05
11:45
|
Chinese 🇨🇳 People Is Rescued ⛑️ By Nepali Army 🇳🇵 After 11 Days in Upper Trishuli-1 Tunnel(216 MW )
|
This is a positive operational and humanitarian recovery item reporting the rescue of Chinese nationals from the Upper Trishuli-1 tunnel, with no allegation or evidence of corporate wrongdoing. The successful rescue reduces immediate reputational exposure, although the underlying tunnel incident may continue to attract attention if further details emerge.
|
A YouTube video with approximately 2,835 reach reports that Chinese nationals were rescued by the Nepali Army after 11 days inside the Upper Trishuli-1 tunnel. The mention is framed positively around the rescue and safety outcome.
|
Open | |
| #80 |
2026-09-05
11:31
|
9 DAY MIRACLE #shorts #nepal #godswill #miracle #naturaldisaster #faith
|
This is an emotional humanitarian narrative linked to the ongoing search for people associated with the Upper Trishuli-1 Hydropower Project, but it does not establish corporate wrongdoing. The unresolved rescue context could escalate if further casualty, family, or accountability claims emerge.
|
A YouTube short titled “9 DAY MIRACLE” references a natural-disaster rescue effort and states that some of those being sought were at the Upper Trishuli-1 Hydropower Project. The video frames the situation through faith and hope, with no allegation against the project or its associated companies.
|
Open | |
| #9 |
2026-09-05
09:29
|
Mero desh#चिनिया नागरिकको उद्धार #थप आशा पलाउदै #nepal#shorts#viral#fyp#viralvideo#salutenepalarmy
|
This is a positive operational and humanitarian recovery update naming UT-1, with no allegation or evidence of corporate wrongdoing. The continuing tunnel incident remains a sensitive exposure that could escalate if further casualties, failed searches, or accountability claims emerge.
|
A YouTube short reports that another person was rescued from the Upper Trishuli-1 tunnel after 11 days. The post is framed positively and expresses renewed hope, with no criticism of the project or associated companies.
|
Open | |
| #10 |
2026-09-05
09:03
|
Dramatic Rescue In Nepal | Chinese National Pulled Alive From Flood-Hit Hydropower Tunnel | N18G
|
This is a positive operational and humanitarian rescue report involving the Upper Trishuli-1 Hydropower Project, with no allegation or evidence of corporate wrongdoing. The successful recovery could support perceptions of effective emergency response and reduce escalation risk around the incident.
|
A Chinese national was reportedly rescued alive from the flood-affected Upper Trishuli-1 hydropower tunnel in Rasuwa. The rescue was conducted by the Nepali Army with support from a South Korean team.
|
Open | |
| #323 |
2026-09-05
09:01
|
|
This is a humanitarian and operational recovery update involving workers at the named UT-1 project after a prolonged flood emergency; it does not establish corporate wrongdoing. The unresolved disaster narrative could escalate into accountability concerns or renewed scrutiny if additional casualties, missing workers, or response failures emerge.
|
An Instagram post reports that four workers from the flood-affected 216 MW Upper Trishuli-1 Hydropower Project were rescued on the 11th day after devastating floods. The post is negative in sentiment but contains no verified allegation against the project or its operators.
|
Open | |
| #249 |
2026-09-05
08:54
|
माथिल्लो त्रिशूली–१ को सुरुङबाट ११ दिनपछि एक चिनियाँ नागरिकको जीवितै उद्धार! सलाम नेपाली सेना! ❤️
|
यो सकारात्मक उद्धारसम्बन्धी परिचालन सामग्री हो, जसले माथिल्लो त्रिशूली–१ सुरुङबाट एक चिनियाँ नागरिकलाई जीवितै उद्धार गरिएको र उद्धार टोलीको प्रशंसा गरिएको बताउँछ। यसले कुनै कर्पोरेट गलतकार्य स्थापित गर्दैन; बरु संकटपछिको सुधार र संस्थागत समर्थनको संकेत गर्छ।
|
युट्युब सामग्रीले माथिल्लो त्रिशूली–१ को सुरुङबाट ११ दिनपछि एक चिनियाँ नागरिकलाई जीवितै उद्धार गरिएको जनाएको छ। सामग्रीले नेपाली सेना र उद्धार टोलीको साहसिक प्रयासको प्रशंसा गरेको छ।
|
Open | |
| #335 |
2026-09-05
08:33
|
|
This is a positive humanitarian and operational recovery mention highlighting a rescue linked to the flood-affected project; it establishes no corporate wrongdoing. Continued coverage could escalate into accountability concerns if further project impacts, casualties, or unresolved worker cases emerge.
|
An Instagram post reports a rescue at or associated with the flood-affected 216 MW Upper Trishuli-1 Hydropower Project, describing it as a moment of hope on the 11th day after the disaster.
|
Open | |
| #336 |
2026-09-05
08:24
|
|
This is a humanitarian and operational update tied directly to UT-1, describing a prolonged post-flood rescue effort but not establishing corporate wrongdoing. The continued tunnel search could escalate into accountability concerns if workers remain missing or the response is perceived as inadequate.
|
An Instagram post reports that rescuers reached approximately 225 metres inside the Upper Trishuli-1 tunnel in Rasuwa, 11 days after floods swept through the Trishuli River. It says the Nepal Army confirmed the rescue operation.
|
Open | |
| #337 |
2026-09-05
08:21
|
|
This is a positive operational and humanitarian recovery update reporting a rescue from the Upper Trishuli-1 tunnel, with no allegation of corporate wrongdoing. The item may reduce concern around the incident rather than escalate reputational risk.
|
An individual was reportedly rescued from Upper Trishuli-1’s Adit 4 tunnel 11 days after flooding. The Nepal Army and a South Korean disaster-response team conducted the rescue.
|
Open | |
| #338 |
2026-09-05
08:19
|
|
This is an ongoing humanitarian and operational incident involving rescue efforts at the monitored Upper Trishuli-1 project; it does not establish corporate wrongdoing. Continued search activity and unresolved worker-status concerns could escalate into family-led accountability demands or broader criticism if the response remains prolonged.
|
An Instagram post reports that individuals were rescued from the 216 MW Upper Trishuli-1 Hydropower Project after 11 days of intensive search and rescue operations. It states that search and rescue work remains ongoing.
|
Open | |
| #339 |
2026-09-05
08:14
|
|
This is a humanitarian and operational update concerning a prolonged tunnel rescue at the monitored Upper Trishuli-1 project; it does not establish corporate wrongdoing, but continued flood-response and worker-safety coverage could escalate into accountability concerns if further casualties or failures emerge.
|
An Instagram post reports that an individual was rescued from the Upper Trishuli-1 tunnel on the 11th day after the Bhotekoshi flood. The post has no reported reach or allegation against a monitored company.
|
Open | |
| #340 |
2026-09-05
08:13
|
|
This is a positive operational update confirming the safe rescue of a worker from the UT-1 tunnel, with no allegation of corporate wrongdoing. It indicates resolution of an isolated incident rather than an escalation, although continued monitoring may be warranted if further safety concerns emerge.
|
An Instagram post reports that one Chinese worker trapped inside the Upper Trishuli-1 tunnel was rescued safely. The post has very limited reach and is framed as a recovery update.
|
Open | |
| #394 |
2026-09-05
08:10
|
Chinese National Rescued From Upper Trishuli-1 Hydropower Project Tunnel
|
This is a resolved operational and humanitarian incident involving the rescue and medical transfer of a worker, with no allegation or evidence of corporate wrongdoing. It could prompt further safety scrutiny if additional incidents or unresolved worker-protection concerns emerge.
|
A Chinese national trapped inside the Upper Trishuli-1 Hydropower Project tunnel was rescued alive and taken to Kathmandu for further treatment. The report notes that the incident renewed attention to safety sensitivities at major infrastructure projects.
|
Open | |
| #341 |
2026-09-05
08:04
|
|
This is a humanitarian and operational recovery update naming UT-1, with no allegation of corporate wrongdoing. The prolonged 11-day search underscores an ongoing project-related exposure that could escalate if further casualties, missing workers, or accountability concerns emerge.
|
An individual was reportedly rescued from the 216 MW Upper Trishuli-1 Hydropower Project after 11 days of intensive search-and-rescue operations. The Instagram post is positive in tone and highlights the rescue outcome.
|
Open | |
| #395 |
2026-09-05
07:56
|
Foreign National Rescued Alive from Upper Trishuli-1 Hydropower Project Tunnel
|
This is a positive operational and humanitarian recovery update confirming the live rescue of a foreign national from the UT-1 tunnel, with no allegation of corporate wrongdoing or escalation signal. It may support continued monitoring of the incident, but the reported outcome is constructive.
|
A Nepali news blog reports that a Nepal Army rescue team safely rescued a foreign national alive from the Upper Trishuli-1 Hydropower Project tunnel on Saturday.
|
Open | |
| #342 |
2026-09-05
04:06
|
|
This is a severe humanitarian and operational update reporting recovered bodies and an unresolved search operation at the monitored Upper Trishuli-1 project. It does not establish corporate wrongdoing, but the continuing fatalities and rescue efforts could escalate into accountability concerns or broader negative mobilisation if linked to project management or safety failures.
|
An Instagram post with limited reach reports that six bodies have been recovered in the flood-hit Upper Trishuli-1 area while rescue teams continue searching.
|
Open | |
| #343 |
2026-09-05
02:29
|
|
This is an operational and humanitarian update naming the Upper Trishuli-1 project in connection with an ongoing search effort, but it does not establish corporate wrongdoing. The unresolved search could escalate into broader accountability scrutiny if casualties or missing persons remain unresolved.
|
Trained dogs and specialized search teams were deployed from the 216 MW Upper Trishuli-1 Hydropower Project, with the Nepali Army transporting them to Battar. The post is low-reach and carries a positive sentiment classification.
|
Open | |
| #344 |
2026-09-05
02:20
|
|
This is an unresolved humanitarian and operational update concerning search and recovery at the monitored Upper Trishuli-1 project, with bodies still unrecovered. It does not establish corporate wrongdoing, but the prolonged recovery effort could escalate into accountability concerns or criticism if delays or responsibility claims emerge.
|
An Instagram post reports that search and recovery operations continue at the flood-hit Upper Trishuli-1 Hydroelectric Project in Rasuwa, while some bodies have not yet been recovered.
|
Open |