Awario Mentions Report
Showing
126–150
of
172
mentions
| ID | Date | Title | Source / Reach | Risk Tier / Reason | Summary (incl. Sentiment) | Link |
|---|---|---|---|---|---|---|
| #31 |
2026-08-27
05:37
|
#Nepal #Rasuwa #BhoteKoshi #FlashFlood #Infrastructure #SmartInfrastructure #DigitalTransformation
|
This is a broad operational/infrastructure-themed social-media mention of flooding in the Rasuwa–Bhote Koshi area, with no identified allegation or evidence of corporate wrongdoing. The topic warrants monitoring because further reporting could develop into humanitarian, infrastructure-damage, or accountability concerns involving monitored projects.
|
A YouTube post using hashtags related to Nepal, Rasuwa, Bhote Koshi, flash floods, infrastructure, and digital transformation was published on 27 August 2026. The available metadata does not provide verified details about impacts, casualties, or involvement by a monitored company.
|
Open | |
| #129 |
2026-08-27
05:04
|
Nepal Army Rescue | Rasuwa Bhotekoshi Flood Victims Rescue Operation
|
This is a positive humanitarian and institutional-response item documenting Nepal Army rescue and relief efforts, with no allegation or evidence of corporate wrongdoing. It could become reputationally relevant only if later reporting links the flood impacts or response shortcomings to a monitored project or company.
|
A YouTube video with 509 views reports that the Nepal Army is continuing rescue and relief operations for people affected by flooding in the Rasuwa Bhotekoshi area.
|
Open | |
| #130 |
2026-08-27
04:53
|
Rasuwa Bhotekoshi Flood मा APF को उद्धार | Flood Victims Rescued
|
This is a humanitarian and institutional rescue report documenting APF assistance to flood victims, with no allegation or evidence of corporate wrongdoing. It does not indicate a reputational escalation for the monitored hydropower entities.
|
A YouTube post reports an Armed Police Force rescue operation following flooding in the Rasuwa Bhotekoshi area. The video focuses on rescuing flood-affected people and does not mention any monitored company or project misconduct.
|
Open | |
| #32 |
2026-08-27
03:35
|
#Nepal #Rasuwa #BhoteKoshi #FlashFlood #Infrastructure #SmartInfrastructure #DigitalTransformation
|
This is a low-information social-media reference to flooding and infrastructure in the Rasuwa/Bhote Koshi area, with no stated allegation, corporate wrongdoing, or mobilization against a monitored entity. The geographic overlap warrants continued monitoring for emerging humanitarian impacts or accountability claims.
|
A YouTube post with approximately 77,036 reach uses hashtags referring to Nepal, Rasuwa, Bhote Koshi, flash floods, infrastructure, smart infrastructure, and digital transformation; no substantive snippet or specific company allegation is provided.
|
Open | |
| #133 |
2026-08-27
02:38
|
#nepal #nepalflood #flashnews #flashflood #rasuwa #bhotekoshi #flood #naturaldisaster #nepalnews
|
This is an unelaborated disaster-related social-media mention concerning flooding in the Rasuwa/Bhotekoshi area, with no allegation of corporate wrongdoing or verified escalation. The topic warrants continued monitoring for emerging impacts on monitored projects, workers, or affected communities.
|
A YouTube post using hashtags related to Nepal, Rasuwa, Bhotekoshi, and flash flooding was published on 27 August 2026 and recorded a reach of 5,636. No substantive claim or company-specific allegation is provided.
|
Open | |
| #136 |
2026-08-27
02:24
|
Nepal Army Rescue Operation in Bhotekoshi Rasuwa Flood 🇳🇵🚁
|
This is a positive institutional and humanitarian rescue item involving the Nepal Army, with no allegation of wrongdoing or corporate targeting. It does not indicate an escalation risk for the monitored hydropower entities.
|
A YouTube post with 508 reach highlights a Nepal Army helicopter rescue operation during flooding in the Bhotekoshi/Rasuwa area. The content is framed positively and uses rescue-related hashtags.
|
Open | |
| #180 |
2026-08-27
02:18
|
Nepal Flash Flood Washes Away Villages, Damages Roads, Power Projects | N18G
|
This is an operational and natural-disaster report describing flood damage to villages, roads and power infrastructure, without establishing wrongdoing by any monitored company. Continued coverage could escalate into scrutiny of project resilience, disaster response or affected communities if specific company impacts or alleged failures emerge.
|
A YouTube report says flash floods in Nepal washed away villages and damaged roads and power projects in the Rasuwa/Bhotekoshi area. The mention is associated with flood-related hashtags but does not identify a corporate allegation.
|
Open | |
| #138 |
2026-08-27
01:33
|
#Nepal #Rasuwa #BhoteKoshi #FlashFlood #Infrastructure #SmartInfrastructure #DigitalTransformation
|
This is a neutral infrastructure-related social-media mention with no stated allegation, verified harm, or corporate wrongdoing involving the monitored entities. The flood-related topic warrants continued monitoring for any later claims about project damage, safety failures, or accountability concerns.
|
A YouTube post using hashtags related to Nepal, Rasuwa, Bhotekoshi, flash floods, infrastructure, and digital transformation was published on 27 August 2026. No substantive details or allegations are provided in the available snippet.
|
Open | |
| #167 |
2026-08-27
00:00
|
Rasuwa–Bhotekoshi Flash Flood 2026: Lessons for Flood-Resilient Building Design in Nepal
|
This is a neutral, informational item about flood-resilient building design and does not establish wrongdoing by any monitored company or project. It presents only a background disaster-resilience topic, with no evident escalation beyond routine awareness.
|
A web item discusses lessons from the 2026 Rasuwa–Bhotekoshi flash flood for improving flood-resilient building design in Nepal. No company-specific allegation or engagement signal is indicated.
|
Open | |
| #139 |
2026-08-26
19:12
|
रसुवाको भोटेकोशी नदीमा बाढी | Nepal Flash Flood | Rasuwa Bhotekoshi
|
This is a routine operational and humanitarian report of flooding in the Bhotekoshi area, with no allegation of corporate wrongdoing or verified escalation against a monitored entity. Continued monitoring is warranted because severe flooding could develop into infrastructure, community-impact, or accountability concerns if damage or casualties are reported.
|
A YouTube video reports severe flooding in Nepal’s Bhotekoshi River area in Rasuwa and includes a link for overseas assistance. The mention does not identify a company or provide verified details of project damage or casualties.
|
Open | |
| #33 |
2026-08-26
19:00
|
The rains are presenting scenes of flooding. #flood #flooding #floods #nepalflood
|
This is a routine environmental and operational mention of flooding in the Rasuwa/Bhote Koshi area, with no allegation of corporate wrongdoing or verified escalation. It could become a reputational concern if subsequent reporting links the flooding to hydropower-project impacts or inadequate response.
|
A low-reach YouTube post shows flooding scenes in Nepal and uses hashtags referencing Rasuwa, Bhote Koshi and hydropower. The mention does not identify or accuse a monitored company.
|
Open | |
| #296 |
2026-08-26
13:53
|
रसुवा भोटेकोशी बाढीमा देखियो ठूलो माछा 😱 | Rasuwa Bhotekoshi Flood 2026
|
This is a low-engagement social-media observation about unusual wildlife during flooding and does not allege corporate wrongdoing or implicate a monitored company. It has limited plausible escalation beyond routine attention to local flood conditions.
|
A YouTube video shows a large fish reportedly seen in the Bhotekoshi River during severe flooding in Rasuwa. The post focuses on the visual scene and river conditions, with no allegation involving a hydropower project or company.
|
Open | |
| #149 |
2026-08-26
11:16
|
Flash Flood of Trishuli Bazar and Rasuwa from Tibet
|
This is routine disaster-related visual content concerning flooding in a monitored geography, with no allegation of corporate wrongdoing or verified escalation involving the monitored entities. Continued monitoring is warranted because further damage, casualty, or project-impact reporting could increase scrutiny of hydropower operations.
|
A YouTube video with limited reach reports flash flooding affecting Trishuli Bazar and Rasuwa, allegedly originating from Tibet. The post uses Nepal flood, Rasuwa, and Bhotekoshi-related hashtags but does not name or accuse any monitored company.
|
Open | |
| #150 |
2026-08-26
10:56
|
APOCALYPTIC TSUNAMI! Glacial Burst Wipes Out Bridges In Nepal! 🌊😱
|
This is a sensational humanitarian and natural-disaster item concerning flooding in Rasuwa/Bhote Koshi, but it does not identify a monitored company or establish corporate wrongdoing. It could contribute to local concern or misinformation if linked to infrastructure impacts, warranting continued monitoring.
|
A low-reach YouTube video claims that a glacial burst caused severe flooding and destroyed bridges in Nepal, using Rasuwa and Bhote Koshi-related hashtags. No monitored company or hydropower project is named in the available mention.
|
Open | |
| #151 |
2026-08-26
10:49
|
रसुवाको भोटेकोशीमा आयो भीषण बाढी | Rasuwa Bhotekoshi Flood Today | Live Update
|
This is an operational and environmental news item reporting severe flooding in the Bhotekoshi River, without alleging wrongdoing by a monitored company or project. Continued flooding could escalate into infrastructure-damage, safety, or accountability concerns if impacts on hydropower assets or communities are subsequently reported.
|
A YouTube live update reports a sudden severe flood in Nepal’s Bhotekoshi River, originating from the Tibet side. The mention does not provide verified information about damage, casualties, or company involvement.
|
Open | |
| #230 |
2026-08-26
06:01
|
रसुवामा भोटेकोशीको भयानक बाढी | नुवाकोटदेखि चितवनसम्म बाढीको त्रास #RASUWA #Bhotekoshi #trisuli
|
This is a humanitarian and weather-related warning about flooding in the Bhotekoshi and Trishuli areas, with no allegation of corporate wrongdoing or verified escalation against a monitored entity. Continued monitoring is warranted because confirmed casualties, infrastructure damage, or links to project operations could increase accountability scrutiny.
|
A YouTube post expresses concern about severe flooding in Rasuwa and Nuwakot, warning of possible human and property damage and urging people to remain safe. The post uses Bhotekoshi and Trishuli-related hashtags but does not identify a company or report a specific project impact.
|
Open | |
| #211 |
2026-08-26
00:00
|
MECEE-BL Entrance Preparation 2027 – Guide & Free MCQs | SafalTopper
|
This is a routine institutional/educational reference to deadline changes following the Rasuwa/Bhotekoshi flood and does not establish wrongdoing by a monitored company or project. No material escalation is indicated, although the flood context could support further humanitarian or accountability narratives if impacts remain unresolved.
|
An MECEE-BL entrance-preparation page notes that the Medical Education Commission extended an application deadline due to disasters caused by the Rasuwa/Bhotekoshi flood. The mention is incidental and provides no allegation against the monitored hydropower entities.
|
Open | |
| #212 |
2026-08-10
00:00
|
MECEE-BL 2027 Medical Entrance Notice: Programmes, Eligibility, Documents
|
This is a routine institutional/administrative notice referencing the Rasuwa/Bhotekoshi flood as the reason for extending medical-entrance applications. It establishes no wrongdoing by any monitored company and presents no plausible corporate escalation beyond continued background sensitivity to the flood narrative.
|
A news blog reports that Nepal’s Medical Education Commission extended MECEE-BL 2027 application deadlines because of flooding in Rasuwa/Bhotekoshi. The notice provides programme, eligibility, document and payment-deadline information.
|
Open | |
| #213 |
2026-08-09
00:00
|
MECEE-BL 2027 Registration: Full Timeline, Fees, and How to Apply
|
This is an institutional admissions notice that references deadline extensions following the Rasuwa/Bhotekoshi flood, without alleging wrongdoing by any monitored company or project. The mention is unlikely to escalate beyond routine public awareness of the disaster’s administrative impacts.
|
An MECEE-BL 2027 registration explainer states that deadlines were extended because of disasters caused by the Rasuwa/Bhotekoshi flood. It lists the regular-fee bank deposit deadline as September 8, 2026.
|
Open | |
| #365 |
2026-07-27
12:57
|
|
This is a routine institutional recruitment notice naming Rasuwagadhi Hydropower Company Limited and establishes no corporate wrongdoing or reputational allegation. No plausible escalation is indicated beyond ordinary employment-related engagement.
|
An Instagram post advertises a Chief Executive Officer vacancy at Rasuwagadhi Hydropower Company Limited, including the application email and deadline.
|
Open | |
| #184 |
2026-07-13
04:15
|
Rasuwagadhi Hydropower Project Halts Production Due to Flood Risk
|
This is a neutral operational report about a precautionary production halt due to flood risk and does not establish corporate wrongdoing. Continued flooding or prolonged disruption could escalate into infrastructure-damage, safety, or accountability concerns.
|
The Rasuwagadhi Hydropower Project has halted electricity production because of flood risk. The item provides no further details on damage, casualties, or the expected duration of the shutdown.
|
Open | |
| #185 |
2026-07-13
03:27
|
Rasuwagadhi Hydropower Project Shuts Down Temporarily Due to Flooding in Lhende River
|
This is a routine operational disruption caused by flooding and does not establish corporate wrongdoing or an accountability allegation. Continued shutdown or infrastructure damage could escalate into a broader operational and community-impact concern if unresolved.
|
The Rasuwagadhi Hydropower Project reportedly shut down temporarily after flooding in the Lhende River. The item provides no further detail on damage, injuries, or the expected duration of the shutdown.
|
Open | |
| #186 |
2026-06-10
07:27
|
Reconstruction of Flood Damaged Rasuwagadhi Hydropower Project Intensifies
|
This is an operational recovery update concerning reconstruction of the flood-damaged Rasuwagadhi Hydropower Project and does not establish corporate wrongdoing. The item indicates remedial activity rather than a new reputational allegation, though further reporting could raise concerns about resilience, delays, or project management if shortcomings are identified.
|
A news-blog post reports that reconstruction of the flood-damaged Rasuwagadhi Hydropower Project is intensifying. No specific company, allegation, casualty, or escalation is identified.
|
Open | |
| #325 |
2026-05-28
14:09
|
|
This is a positive operational and institutional update announcing a construction milestone at UT-1, with no allegation of corporate wrongdoing or adverse stakeholder response. It is unlikely to escalate beyond routine project visibility.
|
Upper Trishuli-1 conducted a ceremony for the operation of its newly installed weir gate, attended by a Korean envoy. The Instagram post had no reported reach or negative sentiment.
|
Open | |
| #377 |
2026-05-28
07:38
|
Upper Trishuli-1 Hydropower Project Successfully Tests First Weir Gate Operation
|
This is positive operational reporting on a construction milestone and does not establish corporate wrongdoing or a reputational concern. It is more likely to reinforce perceptions of project progress than escalate into a risk issue.
|
The 216 MW Upper Trishuli-1 Hydropower Project reportedly completed installation and successful testing of its first weir gate, marking progress in construction.
|
Open |